NEAT-PATCH®

Professional 2U Horizontal Cable Management

NP2 2U Cable Management Bay

$64.99
Free domestic shipping. Volume discounts apply automatically at checkout.
Quantity
2U Rack Space High-density horizontal cable management engineered for standard 19-inch equipment racks.
High-Density Cable Control Stores controlled patch-cable slack inside the horizontal bay instead of loading bulky front vertical managers.
Shipping Outside the United States? International freight varies by destination, quantity, carton count and order configuration. We quote each shipment individually so you receive an accurate freight cost before ordering.

Buy More, Save More – Automatically!

Get up to 15% off when you buy in bulk. No codes, no hassle — discount applies automatically at checkout.

2U Horizontal Cable Manager

What’s Included

NP2 2U Cable Management Bay

1× NP2 Cable Management Bay

Ventilated 2U horizontal manager for standard 19-inch network racks.

2× Cable-Entry Grommets

Protect patch cables at the entry points and support clean routing into the management bay.

4× Rack-Mounting Screws

Mounting hardware for installation in a standard 19-inch equipment rack.

SP24 Smart Pack sold separately

Patch Cables Sold Separately

Pair the NP2 with SP24 Smart-Packs when you want the complete Neat-Patch 2-foot cable system.

Built for High-Density Racks

The 2U bay provides horizontal slack control for dense switch and patch-panel layouts.

2′

Controlled Slack Storage

Patch-cable slack is stored inside the manager, keeping the rack face organized and serviceable.

Rack Density Preserved

Slack is controlled inside the horizontal manager rather than filling front vertical-management space.

Airflow Stays Open

The ventilated NP2 body manages cable routing while keeping equipment faces and airflow paths accessible.

Real Installation

Control the Cable Where It Belongs

The NP2 is a 2U horizontal cable management bay built to contain patch-cable slack inside the rack. Instead of pushing excess cable into bulky finger-duct vertical managers, the NP2 keeps routing compact, accessible and out of equipment airflow paths.

High-density rack before patch cable slack is controlled

Step 1 — Get Excess Cable Off the Rack Face

Stop Using Vertical Space as a Storage Bin

Long patch cords create bundles that consume vertical-manager capacity, obstruct access and complicate service. The NP2 moves slack control into a dedicated 2U horizontal bay so the front of the rack stays usable.

Step 2 — Route With Bend Radius in Mind

Store Service Slack Without Crushing the Cable

The open internal bay gives patch cords room to form controlled service coils rather than being packed into narrow finger ducts. That keeps routing predictable and preserves access when a connection needs to be changed.

Controlled patch cable service coils inside a Neat-Patch installation
Finished high-density Neat-Patch rack installation

Step 3 — Preserve Density and Serviceability

A Cleaner Rack Without Oversized Cable Management

The NP2 keeps cable management horizontal and compact. Equipment faces remain accessible, airflow paths stay open and technicians can trace or replace individual connections without digging through a wall of cable.

The Neat-Patch Method

Use Rack Space for Equipment, Not Excess Cable

The NP2 is the 2U foundation of the Neat-Patch system. Pairing a ventilated horizontal management bay with properly sized patch cables controls slack at the source, preserves rack density and avoids the bulk created by traditional finger-duct cable storage.